When creating a new test or modifying an existing one by clicking on the test name, the following tabs are generally displayed (the selection of tabs depends on the type and status of the test):
- General Data – Here, the type of test must be specified. Different types have different conditions applied. It is mandatory to specify the test type, subject, and name.
- Structure (or Structure and Tasks, if it is a diagnostic test)
- Feedback
- Tasks
- Testing activities
- Compilation
- Pre-testing
- Response Analysis (appears if it is a publicly viewable test and has been taken)
- History of compilation
- A new test is created.
- The test structure is designed.
- Variant of tasks are added, and tasks are selected for them.
- A test session and its time are created.
- The test structure is confirmed.
- Task sets are confirmed.
- A registration method is assigned to the test session (e.g., educational institution via Examodo, test-taker via Examodo, Examination Center) along with the registration period.
- The test time is linked to the task sets, and the date or date range for the test is determined.